Sunday 29 March 2009

.. Progress Report - Film production ..

This week was realy good because we have completed our film production. we just need to have a last check throught it and see if everthying is in order, but besides that it is evrtially completed. we have around 2minutes and 10seconds of our trailer all together. i spent most of my time on the film production although i did have some input towards the 1st and 2nd print production, however my group had more input towards the print productions compared to the film production, however either way the work load was balanced out and we were all doing something productive. on tuesday we did some more filming because we needed one shot of me in blood to link up some of the other shots where there was blood on the knife and on the killers hand, however there was no shot of me actualy with blood so it makes the hole point of the other blood shots so we took shots of me with fake blood on me to fill in those gaps of how whose blood it was and how it got there etc.

WWW..
- we compleetd the film production on time
- the final production of it came out exactly how we wanted it to

EBI..
- we finish the 2nd print production
- check on the film production one final time to make sure its perfect with no mistakes
- we add the credits onto the end of our trailer

No comments: